You don't have javascript enabled. Good luck with that.
Pencarian
Minimalisir Genangan, Pemkot Jakut Keruk Kali Petukangan Sepanjang 1.600 Meter
.
photo TP Moan Simanjuntak - Beritajakarta.id

Kali Petukangan Dredged Along 1.6 Kilometers

North Jakarta Water Resource Sub-dept. dredged Kali Petukangan in Pegangsaan Dua Urban Village, Kelapa Gading. Two unit of excavators were deployed to speed up dredging.

Mud was really dense. When raining, water can overflow easily and flooded residents

"Mud was really dense. When raining, water can overflow easily and flooded residents," said Herning Wahyuningsih, North Jakarta Water Resource Sub-dept. head, Thursday (1/19).

According to Herning, dredging process is planned along 1.6 kilometers. This will add three meters depth to Kali Petukangan which have 13 meters wide.

Petukangan Channel Normalization is Still Reviewed

"Through this effort, it can load more water in rainy season. So, we can anticipate flood at RW 09 area of Pegangsaan Dua urban district and RW 016, 09, 10, and 07 area of Kelapa Gading Timur," he closed.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye954 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye660 personBudhi Firmansyah Surapati
  3. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye395 personTiyo Surya Sakti
  5. Traffic Arrangement Applied on Jalan Tambak

    access_time28-10-2024 remove_red_eye370 personAldi Geri Lumban Tobing